Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C24221B0047_1
The Contractor must furnish all labor, materials, tools and supervision to complete the following: Renovate Compactor Station (Building 100 Ground Floor GH-02): Project 526-19-130 The renovation of an...
The Contractor must furnish all labor, materials, tools and supervision to complete the following: Renovate Compactor Station (Building 100 Ground Floor GH-02): Project 526-19-130 The renovation of an approximately 3500 S.F. space on the Ground Floor H Wing of the Main Hospital (Building 100) of the James J. Peters VA Medical Center to completely renovate the existing Compactor Station. The work includes but not limited to the construction of barriers to comply with infection control and life safety regulations, selective demolition, general carpentry, electrical, plumbing, fire protection and detection, HVAC, telecommunication, security systems, and interior finish work in accordance to the supplied specifications and drawings. In addition to the work detailed on the specifications and drawings, the contractor will be tasked to coordinate with San-I-Pak Inc. and the VA for the installation of the San-I-Pak provided metal platform and sterilizing machines shown on the drawing set. If field changes for the site prep of the equipment is required, the contractor is expected to communicate between the VA COR, A/E consultant, and San-I-Pak. Anteroom and smoke barrier wall will be constructed along the perimeter of the project before any construction work commences. All proper infection control and life safety measure will be provided and coordinated with Infection Control and Safety Officer. Work is expected to be completed within 300 calendar days from NTP.