4510--Newington Fire Suppression and Steam Leak Repairs
The amendment clarifies RFI responses for fire suppression and steam leak repair work in Newington, specifying that a superintendent can also cover SSHO and QA/QC roles if credentials are accepted. No sales tax should be included in the proposal, and the wage determination at award applies for the project's life. No asbestos is expected, but testing is allowed if suspected, and the work must be completed safely with any unforeseen conditions handled as modifications. No design drawings are available, so contractors must rely on the pre-bid walkthrough, and the existing valve will be replaced with straight pipe while the sprinkler valve cannot be relocated and the wall cannot be cut. This is a Service Disabled Veteran Owned Business (SDVOSB) set-aside for an M&O repair scope.