Inactive
Notice ID:36C10E22Q0104
Please confirm that the contractor is not responsible for the existing damage to the walls. The contractor is not responsible for existing damage. Please provide the wage determination for this solici...
Please confirm that the contractor is not responsible for the existing damage to the walls. The contractor is not responsible for existing damage. Please provide the wage determination for this solicitation. The Davis-Bacon ACT helps determine wage rates. As mentioned in the Act, The local prevailing wage. Please provide a digital copy of the as-built plumbing drawings We currently do not have a digital copy available for viewing. Please confirm that all Supervisor s on the project will be required to have a OSHA 30 card and all workers will be required to have an OSHA 10 card. Not required by our office but recommended for this project. Please confirm that the contractor will be allowed to turn the isolation valves off for the water fountains during the installation. Confirmed at each location. All existing water fountains have their own shut off at the fixture. Will be acceptable to use pro-press fittings for the installation? Pro press is not to be used within the Bay Pines Regional office at this time. Other options like sweeting copper is allowed but will require a VA campus hot permit 24hrs prior to conducting the hot work. Â