Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:36C10E20Q0259
Amendment 0001 36C10E20Q0259 Response to Contractor Questions and confirmation of due date and time. Date Quotes are due is 9/11/2020 3: PM. Is Project tax exempt? The US Federal government is tax ex...
Amendment 0001 36C10E20Q0259 Response to Contractor Questions and confirmation of due date and time. Date Quotes are due is 9/11/2020 3: PM. Is Project tax exempt? The US Federal government is tax exempt Price schedule page shows 2 CLINs. Clin 0001 has Labor to install PA system. Clin 0002 is asking for Install and Test . Should install and Test be removed from CLIN 0002 since it is part of CLIN 0001 SOW to install and test to make sure system is working, and make CLIN 0002 for Training only? Contractors can structure the quote as they deem necessary as long it meets the requirements of the SOW and RFQ. Are drawings that show floor plans available? no basement layout available, available drawings will be emailed if needed to interested parties who confirmed intent to quote. Is PA cabling required to be in conduit 100% all the way? This will have to factored by you and how you interpret the RFQ SOW/RFQ.  What floors Do Not require PA cabling conduit installation and allow use of J-hooks? Same as question 5. What floors require PA cabling conduit installation? Same as question 5 On what floors j-hooks can be used instead of installing conduit? Same as question 5 Was the site visit mandatory? Ni it was not, each interested party would have had to determine that themselves. Facility is in San Juan PR. COVID 19 Restrictions had to be factored in so it was not made mandatory.