523A5-18-371 Building 4 Elevator Replacement VAMC Brockton
This project involves the modernization of two existing elevators and associated construction work at Building 4 of the Brockton VA Healthcare System in Brockton, MA. The work must be completed within 365 calendar days from a tentative Notice to Proceed in May 2026. It requires specific Massachusetts-licensed contractors for electrical, mechanical, and elevator work, and mandates certified technicians and inspectors. The scope includes general construction, demolition, abatement of regulated materials, and coordination with VA staff. All work must comply with state regulations and OSHA codes, with materials and shop drawings requiring government approval.