UT NP ARCH 100(2) Bridges on Delicate Arch Road

Notice ID:6982AF27B000005

This project will reconstruct Delicate Arch Road in Arches National Park, including three new 100-foot concrete bridges over Salt Valley Wash, Salt Wash, and Winter Camp Wash, with roadway raising, realignment at Salt Valley Wash, and pavement restoration/overlay work. The work is intended to improve stream flow and sediment transport, reduce flooding and closures, and improve visitor safety. The estimated total cost is between $10,000,000 and $20,000,000. Anticipated non-bid milestones include award in November 2026, notice to proceed in December 2026, and contract completion in December 2028. The project will be solicited as a full and open competition.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   Y1LB CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS


Data sourced from SAM.gov. View Official Posting »

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Notice ID:6982AF27B000005

The National Park Service anticipates a full-and-open competition to reconstruct Delicate Arch Road in Arches National Park, Utah, including design and construction of three 100-foot concrete bridges at Salt Valley Wash, Salt Wash, and Winter Camp Wash. Work includes raising the roadway profile for a 10-year design frequency and excavator access, realigning the roadway/bridge at Salt Valley Wash, and restoring remaining sections with full-depth reclamation or pavement removal plus a 4-inch asphalt overlay. Principal quantities include embankment, riprap, roadway aggregate, asphalt pavement, structural concrete, reinforcing steel, bridge railing, drilled shafts, curb, guardrail, and temporary traffic control. The estimated total cost range is $10,000,000 to $20,000,000. Anticipated schedule is award in November 2026, notice to proceed in December 2026, and contract completion in December 2028.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   Y1LB CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS


Data sourced from SAM.gov. View Official Posting »

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Notice ID:6982AF27B000005

The project will reconstruct Delicate Arch Road in Arches National Park, including design and construction of three 100-foot-span concrete bridges at Salt Valley Wash, Salt Wash, and Winter Camp Wash, roadway profile raises, realignment at Salt Valley Wash, and pavement restoration/overlay on remaining sections. The work addresses inadequate existing culverts that cause flooding, sediment deposition, unsafe visitor conditions, road closures, and high operational costs. The total estimated cost is between $10,000,000 and $20,000,000, and it will be solicited as a full and open competition. Anticipated schedule milestones include advertisement in September 2026, award in November 2026, notice to proceed in December 2026, and contract completion in December 2028. Performance will occur on Delicate Arch Road within Arches National Park, near the Salt Wash Basin downstream of Wolfe Ranch.

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Notice ID:6982AF27B000005

This full-and-open competition will design and construct three 100-foot-span concrete bridges on Delicate Arch Road within Arches National Park, replacing inadequate culverts at Salt Valley Wash, Salt Wash, and Winter Camp Wash. The work includes roadway realignment at Salt Valley Wash, raising the roadway profile for a 10-year design frequency, and full-depth reclamation or pavement removal with a 4-inch overlay on 3R sections. Principal work includes embankment, riprap, roadway aggregate, asphalt pavement, structural concrete, reinforcing steel, bridge railing, drilled shafts, curb, guardrail, and temporary traffic control. The estimated cost range is $10,000,000 to $20,000,000. Anticipated milestones are advertisement in September 2026, award in November 2026, notice to proceed in December 2026, and contract completion in December 2028.

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Inactive
Notice ID:6982AF27B000005

This project will reconstruct Delicate Arch Road within Arches National Park and design and construct three 100-foot-span concrete bridges at Salt Valley Wash, Salt Wash, and Winter Camp Wash to improve stream flow and sediment transport. Work includes raising the roadway profile at each wash, realigning the roadway at Salt Valley Wash, and applying full-depth reclamation or pavement removal followed by a 4-inch overlay on remaining roadway and parking areas. Principal work items include embankment, riprap, roadway aggregate, asphalt pavement, structural concrete, reinforcing steel, bridge railing, drilled shafts, curb, guardrail, and temporary traffic control. The estimated cost range is $10,000,000 to $20,000,000, and the project will be solicited as full and open competition. Anticipated schedule includes advertisement in September 2026, award in November 2026, notice to proceed in December 2026, and contract completion in December 2028.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
LOCATION: Not Given
Primary Contact
Laura Slauter
Not Given
Alt Contact
Ryan Phillips
Not Given

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »

UT NP ARCH 100(2) Bridges on Delicate Arch Road

Notice ID:6982AF27B000005

This project in Arches National Park, Utah, involves reconstructing Delicate Arch Road, including replacing inadequate culverts with three 100-foot concrete bridges over Salt Valley Wash, Salt Wash, and Winter Camp Wash. The work also includes roadway realignment, full-depth reclamation, pavement overlay, and associated structural and safety improvements. The total estimated cost is between $10,000,000 and $20,000,000. Anticipated award is November 2026, with contract completion expected by December 2028. The scope is designed to reduce flooding, sediment deposition, and road closures while improving visitor safety and access.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   Y1LB CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
LOCATION: Not Given
Primary Contact
Laura Slauter
Not Given
Alt Contact
Ryan Phillips
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »