CO NP ROMO 407(1) Holzwarth Culvert
This project will replace the deficient Holzwarth Culvert—a six-barrel corrugated metal arch pipe culvert on Holzwarth Access Road—with a steel girder bridge in Rocky Mountain National Park, about nine miles north of Grand Lake, CO, along US Hwy 34 at 8,900 feet. Work includes removing the existing culvert; constructing a new steel girder bridge with cast-in-place concrete deck, abutments, and micropiles; temporary stream diversion and riprap; aggregate roadway surfacing; and relocating an electrical line and historic head gates. Site access is on foot a quarter mile past a locked gate at the south end of the Holzwarth Historic Site parking lot; the access road is about 13 feet wide with tight turns, requiring temporary widening and a truck turnaround, and no construction access is allowed more than 100 feet west of the bridge. Anticipated schedule is advertisement in September 2026, award and notice to proceed in December 2026, and contract completion in November 2027. Total estimated cost is between $700,000 and $2,000,000.