This project will replace the deficient Holzwarth Culvert—a six-barrel corrugated metal arch pipe culvert on Holzwarth Access Road—with a steel girder bridge in Rocky Mountain National Park, about nine miles north of Grand Lake, CO, along US Hwy 34 at 8,900 feet. Work includes removing the existing culvert; constructing a new steel girder bridge with cast-in-place concrete deck, abutments, and micropiles; temporary stream diversion and riprap; aggregate roadway surfacing; and relocating an electrical line and historic head gates. Site access is on foot a quarter mile past a locked gate at the south end of the Holzwarth Historic Site parking lot; the access road is about 13 feet wide with tight turns, requiring temporary widening and a truck turnaround, and no construction access is allowed more than 100 feet west of the bridge. Anticipated schedule is advertisement in September 2026, award and notice to proceed in December 2026, and contract completion in November 2027. Total estimated cost is between $700,000 and $2,000,000.

CO NP ROMO 407(1) Holzwarth Culvert

Notice ID:6982AF27B000004

The project will replace the Holzwarth Culvert on Holzwarth Access Road in Rocky Mountain National Park—about nine miles north of Grand Lake, CO, along US Hwy 34 at 8,900 feet—with a new steel girder bridge and cast-in-place concrete deck. Work includes removing the existing six-barrel culvert, constructing new abutments and micropiles, temporary stream diversion and riprap, aggregate roadway surfacing, relocating an electrical line, and relocating historic head gates into a new concrete slab. Site access is constrained: access is on foot a quarter mile past a locked gate, the roughly 13-foot-wide access road has tight turns requiring temporary widening and a truck turnaround, and no construction access is allowed more than 100 feet west of the bridge. The estimated total cost range is $700,000 to $2,000,000. Anticipated award and notice to proceed are December 2026, with contract completion in November 2027.

CO NP ROMO 407(1) Holzwarth Culvert

Notice ID:6982AF27B000004

The Holzwarth Culvert project in Rocky Mountain National Park—about nine miles north of Grand Lake, CO, along US Hwy 34 at 8,900 feet—will replace a deficient six-barrel corrugated metal arch culvert on Holzwarth Access Road with a steel girder bridge and cast-in-place concrete deck. Work includes new abutments and micropiles, temporary stream diversion and riprap, aggregate roadway surfacing, relocation of an existing electrical line, and relocation of historic head gates into a new concrete slab. Site access is constrained: access is on foot a quarter mile past a locked gate, the access road is about 13 feet wide with tight turns, temporary widening and truck turnaround will be needed, and no construction access is allowed more than 100 feet west of the bridge. Anticipated schedule is advertisement in September 2026, award and notice to proceed in December 2026, and contract completion in November 2027. Estimated total cost is between $700,000 and $2,000,000.

CO NP ROMO 407(1) Holzwarth Culvert

Notice ID:6982AF27B000004

The project will replace the deficient Holzwarth Culvert, a six-barrel corrugated metal arch pipe culvert on Holzwarth Access Road, with a new steel girder bridge and cast-in-place concrete deck in Rocky Mountain National Park about nine miles north of Grand Lake, CO, along US Hwy 34 at 8,900 feet elevation. Work includes removing the existing culvert, constructing new abutments and micropiles, temporary stream diversion and riprap, aggregate roadway surfacing, relocating an existing electrical line, and relocating historic head gates into a new concrete slab. Access is constrained: the site is reachable on foot a quarter mile past a locked gate at the south end of the Holzwarth Historic Site Parking Lot, the access road is about 13 feet wide with tight turns requiring temporary widening and a truck turnaround, and no construction access is allowed more than 100 feet west of the bridge. Principal work items include bridge removal, 120 tons of roadway aggregate, one prefabricated steel bridge (10 feet wide by 48 feet long modular steel vehicular bridge), 180 linear feet of 8.68-inch micropile, and temporary stream diversion. Anticipated schedule advertises September 2026, awards/NTP December 2026, and contract completion November 2027, with total estimated cost between $700,000 and $2,000,000.