AZ BL COLO 7528(1) Burro Creek Road

Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF27B000002

This Mohave County, Arizona project covers approximately 1.3 miles of Burro Creek Road from the bridge over Burro Creek to the cattle guard near US Highway 93, about 71 miles southwest of Kingman, to improve campground access, drainage, erosion/sediment control, and safety. Work includes full-depth reclamation and asphalt concrete pavement resurfacing, fog/tack seals, cross culverts and headwall reconstruction, ditch reconditioning, berms, bank/slope stabilization, bridge approach repairs, signs, pavement markings, and boulder placement. The contract has a base Schedule A for primary roadway rehabilitation and Option X for bridge sedimentation/undercutting repairs and boulder placement. Anticipated schedule is advertisement in October 2026, award in January 2027, and construction from January through October 2027, with an estimated cost range of $2,000,000 to $5,000,000.

AZ BL COLO 7528(1) Burro Creek Road

Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF27B000002

The project will rehabilitate approximately 1.3 miles of Burro Creek Road in Mohave County, about 71 miles southwest of Kingman, Arizona, from the bridge over Burro Creek to the cattle guard near US Hwy 93. This 3R resurfacing, restoration, and rehabilitation effort is intended to improve campground access and address maintenance, erosion, sediment control, drainage, and safety issues. Work includes full-depth reclamation with asphalt concrete pavement, fog/tack coats, cross culverts and headwall reconstruction, ditch reconditioning, berms, bank stabilization, riprap, embankment benching, slope stabilization/scaling, bridge approach repairs, signs, pavement markings, and boulder placement. The contract is structured with a base Schedule A for primary roadway rehabilitation and Option X for bridge sedimentation repair, bridge-approach undercutting repair, and boulder placement. Anticipated advertisement is October 2026, award is January 2027, construction runs January through October 2027, and the estimated cost range is between $2,000,000 and $5,000,000.

AZ BL COLO 7528(1) Burro Creek Road

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF27B000002

This is not an invitation for bid and plans/specifications are not available; the small-business set-aside project is for resurfacing, restoration, and rehabilitation of Burro Creek Road in Mohave County, Arizona, about 71 miles southwest of Kingman, covering roughly 1.3 miles from the Burro Creek bridge to the cattle guard near US Hwy 93. Major work includes full-depth reclamation and asphalt concrete pavement, culvert and drainage improvements, ditch reconditioning, embankment and slope stabilization, bridge-approach repairs, traffic signs, pavement markings, and boulder placement. The project consists of base Schedule A for primary roadway rehabilitation plus Option X for bridge sedimentation repair, bridge-approach undercutting work, and boulder placement. Anticipated schedule: advertisement in October 2026, award in January 2027, and construction from January 2027 through October 2027. Estimated cost range is between $2,000,000 and $5,000,000.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
LOCATION: Not Given