CO NP BLCA 10(1) South Rim Drive

Inactive
Notice ID:6982AF26SS0015

This is a sources sought notice to determine if sufficient interest exists from qualified small business prime contractors for a potential set-aside. The project is located on South Rim Drive within a National Park and involves boulder removal and dispersal, site grading and base preparation, installation of specialized weathered-look steel guardrail, and traffic control. The estimated cost range for the work is between $700,000 and $2,000,000. A notice to proceed is anticipated in mid-October 2026, allowing for the 8-week guardrail lead time. Construction is expected to run from early April 2027 through late May 2027.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
LOCATION: Not Given
Primary Contact
Denise Martinez
Not Given
Alt Contact
Jorey Deml
Not Given


Data sourced from SAM.gov. View Official Posting »

CO NP BLCA 10(1) South Rim Drive

Notice ID:6982AF26SS0015

This market research notice seeks to determine if there is sufficient interest from qualified small business, HUBZone, woman-owned, 8(a), or service-disabled veteran-owned small business prime contractors for a future solicitation. The project involves restoring roadside protection along South Rim Drive after wildfire damage, including selective boulder removal, site grading, specialized guardrail installation with a weathered-look finish, and traffic control. Performance of services is along South Rim Drive (National Park Service, Colorado), with construction anticipated from early April to late May 2027. The estimated cost range is between $700,000 and $2,000,000. Interested firms must have bonding capacity for a single project of $2 million and prior experience in projects of equal value and scope with the listed work elements.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL HIGHWAY ADMINISTRATION 6982AF CENTRAL FEDERAL LANDS DIVISI
  PSC   Y1LB CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
LOCATION: Not Given
Primary Contact
Denise Martinez
Not Given
Alt Contact
Jorey Deml
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »