Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF24B000016
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. PROJECT NUMBER: NV FLAP 500(1) PROJECT NAME: Red Rock T...
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. PROJECT NUMBER: NV FLAP 500(1) PROJECT NAME: Red Rock Trail PROJECT DESCRIPTION: The Red Rock Trail project is in Las Vegas, Nevada in the outskirts of Summerlin and into the entrance of Red Rock Conservation Area. This project includes construction of a multi-use trail and pedestrian bridge along with reconstruction of State Highway 159 widening. SCOPE OF THE WORK: The project is located adjacent to the Red Rock Conservation Area which is a highly environmentally sensitive area. It includes construction of approximately 1 mile of paved multi-use trail, widening of State Highway 159 for additional turn lane width and construction of a 210-foot pedestrian bridge with drilled shafts. The project includes multiple Partners with Bureau of Land Management, Nevada Department of Transportation and Clark County Public Works. The project will be broken up into a Schedule A and an Option X. Schedule A includes all the trail and bridge. Option X includes work related to State Highway 159. PRINCIPAL WORK ITEMS: Schedule A: Embankment construction – 6,000 CUYD Riprap, Class 7 – 1,400 CUYD Roadway aggregate – 2,000 TON Asphalt concrete pavement – 1,400 TON Precast, Prestressed concrete box beam – 820 LNFT Drilled shaft – 260 LNFT Option X: Roadway aggregate – 800 TON Asphalt concrete pavement – 2,100 TON ANTICIPATED SCHEDULE: Advertisement – October 2024 Award – December 2024 Construction Start – January 2025 Construction Finish – June 2025 The estimated price range of the project work is between $5,000,000 and $10,000,000.