Inactive
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:6982AF23B000002
PROJECT NUMBER: CA NP GOGA 469(1) PROJECT NAME: China Beach Access Road THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SET ASI...
PROJECT NUMBER: CA NP GOGA 469(1) PROJECT NAME: China Beach Access Road THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SET ASIDE. PROJECT DETAILS: CA NP GOGA 469(1) China Beach Access Road PROJECT DESCRIPTION: The project scope includes reconstructing the parking lot for the access to China Beach in San Francisco, California. The project also includes constructing new retaining walls along the trail from the parking lot to Chin Beach, sewer and water utility work, and landscaping. The project is within lands owned by the National Park Service (Golden Gate National Recreation Area) and the City of San Francisco. SIGNIFICANT QUANTITIES: Significant items include (quantities are subject to change): 1 Acre, Clearing and grubbing 7,768 Square Feet of Soil nail retaining walls 460 Cubic Yards of Roadway Aggregate 300 Tons of Asphalt Concrete Pavement 180 Square Yards of 6” colored concrete pavement 410 Linear Feet of colored concrete curb 1 Domestic and Fire Water System Irrigation system, Lump Sum Sanitary Sewer System, Lump Sum Pump and Sump Pit Sanitary System, Lump Sum 440 Square Yards of colored concrete sidewalk 250 linear feet of fence 1 Gate ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in December, 2022. Project award is anticipated in February, 2023. Construction is anticipated between March 2023 and December 2023. ENGINEER’S ESTIMATE: The proposed project is estimated at a cost between $5 million and $10 million.