Inactive
Notice ID:6982AF22B000027
PROJECT NUMBER: CO FLAP PUW16(1) PROJECT NAME: Nichols Road PROJECT DETAILS: The project is located in the Pueblo West Metro District on Nichols Road at the entrance of Lake Pueblo State Park (LPSP). ...
PROJECT NUMBER: CO FLAP PUW16(1) PROJECT NAME: Nichols Road PROJECT DETAILS: The project is located in the Pueblo West Metro District on Nichols Road at the entrance of Lake Pueblo State Park (LPSP). This project consists of reconstructing Nichols Road from LPSP border to the intersection of McColluch Road. The work would also include the reconstruction of McColluch Road to include turn lanes at the intersection. This project will also include constructing 8,220 feet of 8-foot asphalt trail, constructing 725 feet of 8-foot concrete trail, and building a 160-foot pedestrian bridge over the Union Pacific Railroad. SIGNIFICANT QUANTITIES: Schedule A: 20303-1600 Removal of Pavement, Asphalt – 16,800 SQYD 20420-0000 Embankment Construction – 7,500 CUYD 30101-0000 Aggregate Base – 11,200 TON 40301-0100 Asphalt Concrete Pavement. Type 1 – 4,500 TON 55201-0200 Structural Concrete, Class A (AE) – 120 CUYD 55504-0000 Prefabricated Steel Bridge – LPSM 61501-1100 Sidewalk, Asphalt – 5,500 SQYD 63501-0000 Temporary Traffic Control – LPSM Anticipated Schedule The anticipated advertisement date is August 2022. Construction is anticipated from November 2022 to July 2023. Funding The estimated cost range is between $3.0 and $5.0 million.