Inactive
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Notice ID:6982AF22B000006
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SET ASIDE. PROJECT DETAILS: CA NP GOGA 469(1) China Beach Access Road PROJECT D...
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SET ASIDE. PROJECT DETAILS: CA NP GOGA 469(1) China Beach Access Road PROJECT DESCRIPTION: The project scope includes reconstructing the parking lot for the access to China Beach in San Francisco, California. The project also includes constructing new retaining walls along the trail from the parking lot to Chin Beach, sewer and water utility work, and landscaping. The project is within lands owned by the National Park Service (Golden Gate National Recreation Area) and the City of San Francisco. SIGNIFICANT QUANTITIES: Significant items include (quantities are subject to change): 1 Acre, Clearing and grubbing 716 Cubic Yards of Roadway Excavation 8,771 Square Feet of Soil nail retaining walls 1,392 Cubic Yards of Roadway Aggregate 230 Tons of Asphalt Concrete Pavement 234 Square Yards of 6” concrete pavement 296 Square Yards of 6” colored concrete pavement 311 Linear Feet of colored concrete curb 1 Domestic and Fire Water System Irrigation system, Lump Sum Sanitary Sewer System, Lump Sum Pump and Sump Pit Sanitary System, Lump Sum 289 Square Yards of colored concrete sidewalk 164 linear feet of fence 1 Gate ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in March, 2022. Construction is anticipated between May, 2022 and May, 2023. ENGINEER’S ESTIMATE: The proposed project is estimated at a cost between $5 million and $10 million.