Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF21B000025
PROJECT NUMBER: CO FLAP ALA6(1) PROJECT NAME: LANE 6 NORTH THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET ASI...
PROJECT NUMBER: CO FLAP ALA6(1) PROJECT NAME: LANE 6 NORTH THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET ASIDE. PROJECT DETAILS: CO FLAP ALA6(1) Lane 6 North PROJECT DESCRIPTION: The Lane 6 North project is a minor widening/reconstruction, resurfacing, restoration, and rehabilitation (3R) project in Alamosa County, CO (approximately 14 miles north of the City of Alamosa, CO). The proposed project is 16 miles long extending from the intersection of Route 17 (western end) to the intersection of Route 150 (eastern end). The route is used primarily as farmer to market, access to the Great Sand Dunes National Park and Preserve, San Luis Lakes State Park, Zapata Falls and BLM and Forest Service access. General scope of improvement is to pulverize the existing section and place a 2.5-inch HACP section on the reclaimed 8 inches of pulverized existing material, raising the vertical profile of the road by 2.5 inches for the entire 16-mile corridor and minor shoulder widening (1-foot paved). Proposed improvements also include signing and striping enhancements and drainage improvements. SIGNIFICANT QUANTITIES: Schedule A: 30401-5500 Full Depth Reclamation, Method 2, 8-Inch Depth: 16.081 MILE 30501-0000 Full Depth Reclamation with Cement: 4.0 MILE 30611-0000 Cement: 1000 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 40,000 TON 40105-3000 Antistrip Additive, Type 3: 400 TON 40605-0000 Blotter: 1,800 TON 41102-1000 Prime Coat, Method 1: 244,000 SQYD 41201-0000 Tack Coat: 100 TON 63402-0300 Pavement Markings, Type B, Solid (White): 64.126 MILE It is anticipated this project will be advertised in September 2021. Construction is anticipated between May 2022 and October 2022. The proposed project is estimated at a total construction cost between $10 to $15 million.