Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF21B000002
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. Project overview The Bureau of Reclamation (USBR) has coordinated with the Central Federal Lands Highway Division (CFLHD) to...
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. Project overview The Bureau of Reclamation (USBR) has coordinated with the Central Federal Lands Highway Division (CFLHD) to assist with the design and construction of barrier improvements along the Hoover Dam Access Road. The project begins at the Clark County/USBR boundary, approximately 750 ft. west of the security checkpoint on the Nevada side and continues across the Hoover Dam, ending at the Arizona Helipad parking lot on the Arizona Side (Parking Lot 16). Based on available funding the scope of work for the project will focus primarily on barrier improvements. Proposed work includes removal and replacement of guardrail, concrete barrier and installation of pedestrian railing at select locations. Following the 30% site visit, two options have been added for surface treatments, refreshing the striping and minor improvements. The project is proposed to be delivered to acquisitions in late FY-2020 for advertisement. Award and construction are proposed for FY-2021. SIGNIFICANT QUANTITIES: The project focuses primarily on upgrading safety features, including; barrier replacement, permanent signing updates and refreshing permanent striping. Major quantities for the project are summarized below: Item Description Unit Quantity 30202-2000 Roadway Aggregate, Method 2 TON 1,100 61701-4500 Guardrail System CRG, Type 2, Class A Steel Posts LNFT 5,150 617 End terminals (assorted) EACH 16 633 Permanent Signing EACH 135 63506-0500 Temporary Traffic Control, Flagger HOUR 1,500 Item Description Unit Quantity 40601-0000 Fog Seal TON 28 41402-2000 Cracks, Cleaning and Sealing MILE 4 41801-2000 Asphalt Concrete Pavement Patch, Type 2 SQYD 400 633 Permanent Signing EACH 85 63506-0500 Temporary Traffic Control, Flagger HOUR 150 Item Description Unit Quantity 40601-0000 Fog Seal TON 20 63402-1500 Permanent Pavement Markings MILE 13 41801-2000 Asphalt Concrete Pavement Patch, Type 2 SQYD 400 63506-0500 Temporary Traffic Control, Flagger HOUR 600 63506-0600 Temporary Traffic Control, Pilot Car HOUR 300 CONSTRUCTION DURATION: The project is anticipated to be constructed in Winter of 2020 into Winter 2021. The project may be under construction for 2-5 months, depending upon weather and other factors, including any limitations due to COVID-19. MISCELLANEOUS: The project will have a CAT-EX document for environmental clearance and will require night work. In addition, Davis-Bacon wages for both Clark County, NV and Mohave County, AZ will be required as work is in two states. ESTIMATED DOLLAR AMOUNT INCLUDING OPTIONS: $1 to $3 Million