Inactive
Notice ID:6982AF20B00011
The WY FLAP 30400(1) Gros Ventre Road project is located 15 miles northeast of Jackson, WY. The project includes 3.8 miles of 3R pulverize and pave scope. There is also a small segment of earthwork an...
The WY FLAP 30400(1) Gros Ventre Road project is located 15 miles northeast of Jackson, WY. The project includes 3.8 miles of 3R pulverize and pave scope. There is also a small segment of earthwork and roadway stabilization scope on the eastern end of the project. The proposed project also includes safety improvements and minor drainage improvements. Significant Quantities and Line Items: Line Item Unit Estimated Quantity Mobilization LPSM 1 Subexcavation CUYD 2,100 Pulverization SQYD 15,000 Asphalt Concrete Pavement TON 8,000 The NW Wyoming region typically has very cold winter temperatures, with potential for extreme snowfall. The typical construction season varies based on spring snowmelt and fall precipitation amounts. The anticipated advertisement date is April 2020 with construction anticipated from July 2020 to September 2020. The estimated price range is between $3,000,000 and $4,000,000.