Inactive
Notice ID:6982AF20B00005
This project includes two locations in Badlands National Park and one location at the Minuteman Missile Visitors Center. The type of work includes mill and overlay, reconstruction for the two Badlands...
This project includes two locations in Badlands National Park and one location at the Minuteman Missile Visitors Center. The type of work includes mill and overlay, reconstruction for the two Badlands locations, and slurry seal for the Minuteman Missile Visitors Center. The project is broken into the main schedule and 2 options; Schedule A that includes Dillon Pass and Bigfoot Pass work, Option X that includes a fill repair and roadway reconstruction on the west end of the Dillon Pass work, and Option Y that includes the slurry seal at the Minuteman location. SIGNIFICANT QUANTITIES (Schedule A): 8100 cubic yards of Embankment Construction, 6000 cubic yards of Embankment Construction (shallow reinforced soil slope), 4069 cubic yards of Embankment Construction (reinforced soil slope), 3700 tons of Asphalt Concrete Paving, 33,000 square yards of Asphalt Milling, 130 feet of 72-inch Pipe Culvert (concrete), 10,600 feet of Concrete Curb (18 inch), 26,000 square yards of Rolled Erosion Control Product (Type 4), and 2,200 Hours of Temporary Traffice Control, Flagger. (Option X): 3,300 cubic yards of Embankment Construction, 7,000 cubic yards of Embankment Construction (reinforced soil slope), 330 tons of Asphalt Concrete Pavement, Type 1, 270 feet of 24-inch Pipe Culvert (HDPE) and 500 hours of Temporary Traffic Control, Flagger. (Option Y): 8,000 square yards of Micro Surfacing, Type 2, 3,000 lineal feet of Pavement Markings, Type B, Solid, and Lump Sum Temporary Traffic Control.