Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6982AF20B000022
THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET ASIDE. THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: CA FTNP YOSE 14(7) PROJECT NAME: Repair...
THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET ASIDE. THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: CA FTNP YOSE 14(7) PROJECT NAME: Repairs on Wawona Road PROJECT DESCRIPTION: This project includes repairs to 4 sites on Wawona Road within Yosemite National Park. The work includes excavation/rock excavation (may require blasting) and rock bolts (dowels) to stabilize rock slopes at Milepost (MP) 8.0, special rock embankment to stabilize the road shoulder at MP 18.7, and drainage improvements including pipe culvert installations and placement of riprap at MP 19.6 and 20.3. The terrain is mountainous with the elevation ranging between 4,300 and 5,700 feet. All of the work is occurring in natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction and achieve customer satisfaction. SIGNIFICANT QUANTITIES: 3,800 cubic yards of roadway/rock excavation 490 cubic yards of special rock embankment 200 linear feet of rock dowels 220 linear feet of pipe culverts COST RANGE: The proposed project is estimated at a cost between $1,000,000 and $2,000,000. CONSTRUCTION DURATION: September, 2020 through December, 2020 ADDITIONAL INFORMATION: Anticipated Advertisement: July, 2020 Anticipated Bid Opening: August, 2020 Anticipated Award: September, 2020