Inactive
Notice ID:6982AF19SS0012
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Busi...
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Leslie Karsten and Sheri Walsh) for receipt by close of business (2 p.m. local Denver time) on June 12, 2019: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) Letter from bonding agent stating your firm's capability to bond for a single project of $4 million, and your firm's aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the CO FLAP DEN56(1) Access Connections to ROAR project in which you performed (as the prime contractor) linear grading, aggregate base, asphalt concrete pavement, and bridgework. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS: CO FLAP DEN56(1) Access Connections to ROAR The project is located in Adams County, Colorado, in the Rocky Mountain Arsenal National Wildlife Refuge. The project is a series of trails, pedestrian bridges and parking lots within the Refuge. The general scope of improvements is construction of approximately 7.97 miles of a new multi-use trail described as follows: Approx. 7.73 miles of new crusher fines trail Approx. 1105 feet of trail widening Four prefabricated bridges (approx. 140 feet in length total) Four paved parking areas with associated access road connections Proposed new construction work includes linear grading, aggregate base, asphalt concrete pavement, drainage culvert installation, bridgework, pavement markings, wooden fencing, utility relocation, traffic signal and signs. SIGNIFICANT QUANTITIES: Schedule A: 20101-0000 Clearing and Grubbing: 17.6 ACRE 20420-0000 Embankment Construction: 9,500 CUYD 30201-2000 Roadway Aggregate, Method 2: 2000 CUYD 30202-2000 Roadway Aggregate, Method 2 (Crusher Fines) 28,000 SQYD 40301-0100 Asphalt Concrete Pavement: 1000 TON 55101-1400 Steel H-Piles, 12X53, In Place: 785 LNFT 55201-0200 Structural Concrete, Class A (AE): 96 CUYD 55201-0800 Structural Concrete Class D (AE): 40 CUYD 55504-0000 Pre-Fabricated Steel Bridge (Sand Creek Lateral, 30’x10’): LPSM 55504-0000 Pre-Fabricated Steel Bridge (Uvalda Ditch, 60’x10’): LPSM 55504-0000 Pre-Fabricated Steel Bridge (North Highland Ditch, 25’x10’): LPSM 55504-0000 Pre-Fabricated Steel Bridge (South Highland Canal, 25’x10’): LPSM 61501-0100 Sidewalk, Concrete: 3000 SQYD Anticipated Schedule: Advertise: September, 2019 Award: November, 2019 Construction: March, 2020 – August, 2020 Funding: The anticipated cost range is between $3,000,000 and $4,000,000.