Inactive
Notice ID:6982AF18B000033
This project consists of roadway resurfacing, restoration, and rehabilitation of approximately 18.2 miles of roadway within Sequoia and Kings Canyon National Park and the Sequoia National Forest, Tula...
This project consists of roadway resurfacing, restoration, and rehabilitation of approximately 18.2 miles of roadway within Sequoia and Kings Canyon National Park and the Sequoia National Forest, Tulare County, California, including the Generals Highway from 1 mile east of the State Route 180 intersection to the Little Baldy Saddle. Work also includes rehabilitation/reconstruction of multiple parking areas, and drainage improvements, including culvert cleaning, lining and replacement. The terrain is mountainous with the elevation for the work ranging between 6,400 and 7,600 feet. Construction is anticipated from April 2019 to October 2020. Principle work items include: 46,000 tons of asphalt concrete pavement, gyratory mix, 74,000 linear feet of concrete curb, 17,000 tons of aggregate base, 18.2 miles of full depth reclamation, 17,000 square yards of asphalt paved ditch, 40 each stone masonry headwalls, 900 cubic yards of riprap, 800 linear feet of lining pipe culverts, and 1,200 linear feet of metal pipe culverts. All of the work is occurring in natural resource sensitive areas. Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction and achieve customer satisfaction. Estimated dollar amount including Options is between $15,000,000 and $25,000,000.