Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:697DCK-22-R-00531
October 19, 2022: A clarification was requested for one of the answers posted on the Q&A attachment. That clarification is hereby incorporated as the following attachment: Additional Clarification to ...
October 19, 2022: A clarification was requested for one of the answers posted on the Q&A attachment. That clarification is hereby incorporated as the following attachment: Additional Clarification to questions and answers. The due date for proposals has not been extended. *************************************************************** Amendment 02: Purpose of amendment is to incoporate the Q&A attachment and update attachement J-2A DFWA Raised Floor Replacement Drawings Combined dated October 11, 2022. The due date for proposals has not been extended. *************************************************************** Amendment 01: Purpose of amendment is to incoporate an update miletone, extend the due date, and provide clarification to clause 3.2.2.3-71. All other terms and coniditions remain unchanged and in full effect. *************************************************************** The purpose of this project is to replace raised flooring in the DFWA and DFWB ATCT located at DFW Airport. The Work of Project is defined by the Contract Documents and includes, but is not limited to the following: 1. Removal and replacement of ground level raised floor systems at the DFWA / B ATCT’s, removal and replacement of carpet tile in ground level offices at the DFWA / B ATCT’s, installation of proper grounding system for raised floor systems at the DFWA / B ATCT’s and other Work indicated in the Contract Documents. Please see Attachment J-1 – Specifications, J-2 DFWA Drawings and J-3 DFWB Drawings, for the full scope of work.