Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:697DCK-22-R-00214
Amendment 03: PTAC manual, due date extension Amendment 02 coversheet Amendment 02 answers: Posted 5/29/22. Amendment coversheet will be posted later. Amendment 01: Posted April 22, 2022 ************S...
Amendment 03: PTAC manual, due date extension Amendment 02 coversheet Amendment 02 answers: Posted 5/29/22. Amendment coversheet will be posted later. Amendment 01: Posted April 22, 2022 ************Site Visit Time********** 4/14/22 Site visit start time chnaged to 1PM. Date is still Monday April 18, 2022 *********Clarification***********4/12/2022 Site Visit Date: Should be Monday April 18th. ******Clarifications^^^^^^^ 4/5/2022 1) Due date is May 6, 2022 not May 13. A revised SF-1442 will be released as soon as I am able to. 2) Estimated start should be July 2022. This document defines the requirements to design and construct a new Building Automation System (BAS) for the Moses Lake, Washington Air Traffic Control Tower (MWH) and Base Building located at 7820 Andrews St NE Moses Lake, WA 98837. All existing controls equipment should be demolished and replaced with a new system, including the replacement of all control dampers. The new system should have the capacity to control and monitor the status of each of the roof top units (RTUs) and be able to control and monitor the temperature in each of the zones being served by the RTUs. The upgraded system shall utilize BACnet as the communications protocol and all new equipment should be BACnet compatible. Precision air conditioning (PAC) units in link and on intermediate floors should be tied into the new control system.