The puropose of this amendment is to post Questions and Answers. ------------------------------------------------------------------------------------------- The overall scope of this project is to pro...
The puropose of this amendment is to post Questions and Answers. ------------------------------------------------------------------------------------------- The overall scope of this project is to provide a new 18” high raised access floor system (+/- 2,982 SF) and SRG in the Control Wing Basement at ZDV. (2) new ADA compliant ramps and stairs will be provided to access the new raised access floor. A new 9’-6” partition will be constructed to enclose the new raised access floor system. The existing nonconforming east door will be removed, and a new door will be provided within a new 2-hour rated alcove. The contractor shall provide all necessary labor, materials, and equipment to complete the following work. Also review the attached drawings and specifications.