Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6973GH-22-R-00144
Description Disclosure of the Size of Construction Project: Between $100,000 and $200,000 All Questions are due NLT 22 June 2022 by 1400 PDT. Proposals were due 22 July 2022 by 1400 PDT changed to 25 ...
Description Disclosure of the Size of Construction Project: Between $100,000 and $200,000 All Questions are due NLT 22 June 2022 by 1400 PDT. Proposals were due 22 July 2022 by 1400 PDT changed to 25 July 2022 by 1400PDT. See 3.2.2.3-63 SITE VISIT (CONSTRUCTION) (JUL 2004) for site visit POC. NOTE: Site Visit requires RSVP by 2:00 PDT on 13 June 2022 to Site Visit POC Julie Stoudt by phone 509-742-2610. The Federal Aviation Administration (FAA) requires carpet removal and install as part of FAALC Enhancement Program at the GEG Spokane, WA. The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined; i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, and 13th (air traffic control cab floor); Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements. Contractor work schedule will have to be approved by local FAA POC (point of contact). Contractor will provide samples of carpet, wall base, adhesive, and touch up paint FAA for approval. Reference attached photo and drawings.