TD-208 Pusher Tug FY26 Dry Docking
The U.S. Maritime Administration (MARAD) requires dry-docking services for the patrol boat TD208, with performance to occur at the contractor's facility in the Hampton Roads area of Virginia. The vessel will be delivered to that facility within three working days of a notice to proceed. The Period of Performance for the dry-dock work is 45 days upon delivery, after which MARAD will retake custody at the same location. A MARAD representative intends to be on site most production days. The contractor must provide all services to support the project.