Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6933A225Q000003
The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). Contractor is to provide all labor and...
The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). Contractor is to provide all labor and material required to perform a dry docking of PF-204 Patrol Boat according to the referenced Statement of Work. Barring any weather related or unforeseeable delays, MARAD intends for the patrol boat to be delivered and tendered to the contractor facility within three working days of notice to proceed. MARAD will deliver the PF-204 to the contractor’s facility which shall be located in the Hampton Roads area, such area to include the James River, all branches of the Elizabeth River, York River, Mobjack Bay and tributaries. The dry-docking POP will be 45 days upon completion of delivery and tender. MARAD will assume custody and take re-delivery of the craft at the same contractor’s facility after all work is performed and accepted. MARAD intends to have a representative on site during most production days while the craft is at the contractor’s facility. The contractor will provide the services to support this project. Amend 0001 (Posted 2/19/2025): See attached: Combined Synopsis Solicitation Amend 1 (Changes are highlighted) Q&A #1