Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:6933A223Q000015
. Contractor is to provide all labor and material required to perform a dry docking of FB-214 Crane Barge according to the Statement of Work. Barring any weather related or unforeseeable delays, MARAD...
. Contractor is to provide all labor and material required to perform a dry docking of FB-214 Crane Barge according to the Statement of Work. Barring any weather related or unforeseeable delays, MARAD intends for the barge to be delivered and tendered to the contractor facility within three working days of notice to proceed. MARAD will deliver the FB-214 to the contractor’s facility which shall be located in the Hampton Roads area, such area to include the James River, all branches of the Elizabeth River, York River, Mobjack Bay and tributaries. The dry-docking POP will be 45 days upon completion of delivery and tender. MARAD will assume custody and take re-delivery of the craft at the same contractor’s facility after all work is performed and accepted.