Dry Docking and Special Periodical Survey for M/V “Seaway Guardian”
The RFQ for drydocking and ABS special periodical survey of the M/V Seaway Guardian—including hull, machinery, and automation surveys; load line/IAPP/IOPP certification renewal; and maintenance, steel work, and coating renewal—has been cancelled in its entirety, and no award will be made. The Government is reevaluating its acquisition strategy and operational timeline and intends to resolicit the requirement in 2027, with interested vendors monitoring SAM.gov for the new posting. If resolicited, work would be performed at the contractor’s marine maintenance and repair facility located within the Great Lakes / St. Lawrence Seaway system. The original period of performance required starting within 30 calendar days and completing within 60 calendar days after Notice to Proceed, with the notice expected in September 2026.
Links (0)
Attachments (15)
Data sourced from SAM.gov.
View Official Posting »