Inactive
Notice ID:6923G522C0039
Furnish all plant, labor, equipment, and materials, and perfonn all work to repair existing damaged 18.8K V medium voltage cables at Eisenhower Lock. The project consists of the removal of existing da...
Furnish all plant, labor, equipment, and materials, and perfonn all work to repair existing damaged 18.8K V medium voltage cables at Eisenhower Lock. The project consists of the removal of existing damaged section of cables, splicing in new cables, terminations and testing. lt will require furnishing and installing all equipment and materials including, but not limited to, cables, splices, conduit, wiring, trenching, testing and site restoration.