WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
The project involves 4R roadway reconstruction and related improvements on Grand Loop Road Norris to Golden Gate, Phase 3, located 0.4 miles SW of Mammoth, WY, covering 0.7 miles plus a parking lot. Work includes excavation, blasting, rock scaling, embankment, drainage, parking and roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline and boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. It is a firm-fixed-price task order contract with an estimated price range of $45,000,000 to $55,000,000 and a tentative completion date of Fall 2028. The project will be solicited to Yellowstone/Grand Teton MATOC contractors, with solicitation anticipated in Winter 2026/2027. Preliminary plans and additional project information are posted electronically, and interested parties should follow the SAM.gov opportunity page to be notified when solicitation documents are issued.