WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
This project covers Phase 3 reconstruction of Grand Loop Road from Norris to Golden Gate near Mammoth, WY, involving 0.7 miles of roadway plus a parking lot. Work includes 4R roadway reconstruction, excavation, blasting, rock scaling, drainage, retaining walls, stone masonry, utility relocation, waterline and boardwalk construction, aggregate base, asphalt paving, curb and gutter, striping, and signage. The contract is a firm-fixed-price task order with an estimated price range of $45,000,000 to $55,000,000. It will be solicited to Yellowstone/Grand Teton MATOC contractors, with solicitation anticipated in Winter 2026/2027 and tentative completion in Fall 2028. Preliminary plans and additional project information are posted with the synopsis.