MT DAR 2021(1), Defense Access Roads FY 2021
This work consists of: roadway reconditioning, aggregate surfacing, aggregate stabilization, drainage improvements, and culvert replacement.
This work consists of: roadway reconditioning, aggregate surfacing, aggregate stabilization, drainage improvements, and culvert replacement.
The primary objective of the proposed contract is to resurface existing Minuteman Missile Base Roads consistent with Transporter-Erector (T-E) Route Standards. The application of new aggregate and cal...