Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:69056719B000035
PROJECT: WA FS ERFO 2017(1)-22(11), Gifford Pinchot Repairs 2017 LOCATION: 15 Miles NE of Packwood, WA WORK: 54-26.9 Removed and replace failed culvert, embankment, aggregate base and asphalt surface ...
PROJECT: WA FS ERFO 2017(1)-22(11), Gifford Pinchot Repairs 2017 LOCATION: 15 Miles NE of Packwood, WA WORK: 54-26.9 Removed and replace failed culvert, embankment, aggregate base and asphalt surface 63-12.0 Debris removal, reconstruct road embankment, clean up cut slope and provide for 10' wide rock catchment ditch 88-19.7 Replace damaged culvert with AOP culvert 88-19.8 Replace damaged culvert with AOP culvert 90-11.5 Repair slope failure/slide, stabilize and revegetate slope, obtain temporary R/W 90-28.0 Survey road and design and AASHTO vertical alignment that will pass vehicles with trailers and RVs 90-44.8 Removed and repair pipe culvert with a 100 year storm pipe and reconstruct the embankment 99-4.9 Pavement Patch Type 1 99-5.1 Pavement Patch Type 1 99-5.3 Pavement Patch Type 1 99-5.4 Pavement Patch Type 1 99-7.5 Pavement Patch Type 1 99-8.4 Pavement Patch Type 1 99-8.69 Pavement Patch Type 1 99-10.5 Pavement Patch Type 1 99-11.0 Pavement Patch Type 1 TENTATIVE COMPLETION DATE: Fall 2020 ESTIMATED PRICE RANGE: Between $1,000,000 and $2,000,000