False

San Luis Obispo (SBP) ATCT Roof Replacement

Total Small Business Set-Aside (FAR 19.5)
Notice ID:00SBP

This is a subcontract for the complete replacement of the roof at the Air Traffic Control Tower (ATCT) at SBP. The scope of work includes removing the existing roof system, installing a new roof hatch with a guardrail, replacing all roof drains, and relocating grounding equipment. The approximate roof area for the ATCT cab is 361 square feet. The contractor must provide all labor, materials, equipment, and supervision. All debris must be removed and disposed of daily in compliance with local and state requirements.

Department/Ind.Agency Subtier Office
TRANSPORTATION, DEPARTMENT OF FEDERAL AVIATION ADMINISTRATION 697DCK REGIONAL ACQUISITIONS SVCS
  PSC   Y1BA CONSTRUCTION OF AIR TRAFFIC CONTROL TOWERS


Data sourced from SAM.gov. View Official Posting »