WCF Electrical Substation Upgrade
The Bureau of Engraving and Printing plans a design-build Electrical Safety Substation Upgrade Project at the Western Currency Facility in Fort Worth, TX, involving upgrades to Substations I–IV. The scope includes replacing/retrofitting circuit breakers with Schneider Electric MasterPact units, installing electrical components and ground fault protection, adding remote breaker operation and energy reduction settings, integrating with facility controls, performing arc flash/coordination studies, testing/commissioning, and providing updated drawings/documentation. The contractor must furnish all design/engineering services, labor, materials, equipment, supervision, and related resources per the Statement of Work, applicable codes, and industry standards. This is a total SDVOSB set-aside under NAICS 238210, with an estimated construction magnitude between $1,000,000 and $5,000,000. The anticipated solicitation release date is December 9, 2026, with documents to be available via SAM.gov.