Modernize Regenerative Thermal Oxidizer (RTO)

Notice ID:2031ZA27B00001

BEP’s Western Currency Facility at 9000 Blue Mound Road, Fort Worth, TX, is seeking sources only for a design/build project to replace its modernized regenerative thermal oxidizer (RTO) and associated VOC exhaust ventilation system. The work includes a new RTO with a modern control panel, safe PLCs, lower working voltage, self-optimizing ventilation with performance monitoring, properly sized roof fans, accessible cleanable ducting, higher VOC capture efficiency, reduced ink/oil carryover, and natural gas metering integrated into BEP SCADA. The new system must provide redundancy with the existing RTO so process flow can be diverted between the two RTOs and production can continue during an RTO shutdown. The WCF was built in 1987–1989; the existing RTO was commissioned in 2010, offset presses were added in 2021, and the existing RTO received control-panel and other upgrades in 2025.

Department/Ind.Agency Subtier Office
TREASURY, DEPARTMENT OF THE BUREAU OF ENGRAVING AND PRINTING OFFICE OF THE CHIEF PROCUREMENT OFFICER
  PSC   Z2AZ REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
LOCATION: Not Given
Primary Contact
LaQulla Williams
202-***-2465
Alt Contact
Brandy Idemudia
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »