Elevator Modernization

Total Small Business Set-Aside (FAR 19.5)
Notice ID:2031ZA26Q00100

This opportunity requires a contractor to develop bridging documents, including conceptual design and specifications, for the complete repair of seventeen electric elevators. The work involves replacing obsolete components, upgrading MEP systems, and integrating new controllers with the existing SCADA system. Performance of services is at the location of the elevators, as identified in the 2024 Elevator Assessment. The contractor must ensure compliance with regulations and minimize disruption to building operations. No budget amount or submission timeline is specified in this description.

Department/Ind.Agency Subtier Office
TREASURY, DEPARTMENT OF THE BUREAU OF ENGRAVING AND PRINTING OFFICE OF THE CHIEF PROCUREMENT OFFICER
  PSC   C215 A/E PROD ENG SVCS (INCL DESIGN-CONT
LOCATION: Not Given
Primary Contact
Marico Sellers
Not Given

Links (0)

Attachments (18)

Document
Size
Access
Updated
2031ZA26Q00100 0003.pdf
327.86 KB
Public
Jul 16, 2026
Elevator Modernization Pre-Bid Site Walk - Sign in Sheet 6-24-2026.pdf
89.67 KB
Public
Jul 6, 2026
Attachment 2e - DCF-1001538 Annex and Main Building Elevator Schedule.pdf
253.72 KB
Public
Jul 6, 2026
Elevator Modernization - Request for Clarifications-Questions-Answers - Responses.pdf
125.63 KB
Public
Jul 6, 2026
2031ZA26Q00100 0002 - 6 July 2026.pdf
252.97 KB
Public
Jul 6, 2026
Attachment 1 - Elevator Modernization - Revision 6 Jul 2026.pdf
193.82 KB
Public
Jul 6, 2026
2031ZA26Q00100 0001.pdf
244.99 KB
Public
Jun 18, 2026
Attachment 1 - Site Visit Information 18 June 2026.pdf
129.9 KB
Public
Jun 18, 2026
Attachment 4 - DCF Wage Determination.pdf
43.59 KB
Public
Jun 10, 2026
Attachment 3 - Pricing Schedule.xlsx
10.7 KB
Public
Jun 10, 2026
Attachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf
25.3 MB
Public
Jun 10, 2026
Attachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf
231.64 KB
Public
Jun 10, 2026
Attachments 2b - 75B-07.0-05 EHS Requirements for Purchased Materials.pdf
196.13 KB
Public
Jun 10, 2026
Attachment 2c - 75B-07.0-06 EHS Requirements for Large Equipment Purchases.pdf
169.29 KB
Public
Jun 10, 2026
Attachments 2a - 75D-07.0-04 EHS Contractor Requirements.pdf
211.66 KB
Public
Jun 10, 2026
Attachment 2 - Elevator Modernization - SOW.pdf
193.54 KB
Public
Jun 10, 2026
Attachment 1 - Site Visit Information.pdf
129.09 KB
Public
Jun 10, 2026
2031ZA26Q00100 Elevator Modernization Solicitation.pdf
366.45 KB
Public
Jun 10, 2026


Data sourced from SAM.gov. View Official Posting »

Elevator Modernization

Total Small Business Set-Aside (FAR 19.5)
Notice ID:2031ZA26Q00100

This opportunity requires a contractor to develop bridging documents for the complete repair of seventeen electric elevators, including conceptual design, specifications, and performance criteria. The work involves replacing obsolete components, upgrading MEP systems, and integrating new controllers with an existing SCADA system. Performance of services is at the location of the elevators, as identified in the 2024 Elevator Assessment. The contractor must ensure compliance with all regulations and minimize disruption to building operations. No budget amount or submission timeline is specified in the description.

Department/Ind.Agency Subtier Office
TREASURY, DEPARTMENT OF THE BUREAU OF ENGRAVING AND PRINTING OFFICE OF THE CHIEF PROCUREMENT OFFICER
  PSC   C215 A/E PROD ENG SVCS (INCL DESIGN-CONT
LOCATION: Not Given
Primary Contact
Marico Sellers
Not Given

Links (0)

Attachments (17)

Document
Size
Access
Updated
Elevator Modernization Pre-Bid Site Walk - Sign in Sheet 6-24-2026.pdf
89.67 KB
Public
Jul 6, 2026
Attachment 2e - DCF-1001538 Annex and Main Building Elevator Schedule.pdf
253.72 KB
Public
Jul 6, 2026
Elevator Modernization - Request for Clarifications-Questions-Answers - Responses.pdf
125.63 KB
Public
Jul 6, 2026
2031ZA26Q00100 0002 - 6 July 2026.pdf
252.97 KB
Public
Jul 6, 2026
Attachment 1 - Elevator Modernization - Revision 6 Jul 2026.pdf
193.82 KB
Public
Jul 6, 2026
2031ZA26Q00100 0001.pdf
244.99 KB
Public
Jun 18, 2026
Attachment 1 - Site Visit Information 18 June 2026.pdf
129.9 KB
Public
Jun 18, 2026
Attachment 4 - DCF Wage Determination.pdf
43.59 KB
Public
Jun 10, 2026
Attachment 3 - Pricing Schedule.xlsx
10.7 KB
Public
Jun 10, 2026
Attachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf
25.3 MB
Public
Jun 10, 2026
Attachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf
231.64 KB
Public
Jun 10, 2026
Attachments 2b - 75B-07.0-05 EHS Requirements for Purchased Materials.pdf
196.13 KB
Public
Jun 10, 2026
Attachment 2c - 75B-07.0-06 EHS Requirements for Large Equipment Purchases.pdf
169.29 KB
Public
Jun 10, 2026
Attachments 2a - 75D-07.0-04 EHS Contractor Requirements.pdf
211.66 KB
Public
Jun 10, 2026
Attachment 2 - Elevator Modernization - SOW.pdf
193.54 KB
Public
Jun 10, 2026
Attachment 1 - Site Visit Information.pdf
129.09 KB
Public
Jun 10, 2026
2031ZA26Q00100 Elevator Modernization Solicitation.pdf
366.45 KB
Public
Jun 10, 2026


Data sourced from SAM.gov. View Official Posting »

Elevator Modernization

Total Small Business Set-Aside (FAR 19.5)
Notice ID:2031ZA26Q00100

The contractor must develop bridging documents, including conceptual design and specifications, for the complete repair of seventeen electric elevators, replacing obsolete components and upgrading systems to meet current codes. The work involves MEP upgrades, ACM abatement, PCBs removal, and structural alterations, with new controllers integrated into the existing SCADA system. The documents must enable solicitation of a design-build contract for a complete elevator alteration. Performance is to minimize disruption to building operations and achieve energy savings and sustainability goals. No budget, submission timeline, or performance location is specified.

Elevator Modernization

Total Small Business Set-Aside (FAR 19.5)
Notice ID:2031ZA26Q00100

The contractor will develop bridging documents for the complete repair of 17 electric elevators, including conceptual design, technical specifications, and performance criteria. The work involves replacing obsolete components, MEP upgrades, ACM abatement, PCB removal, and structural alterations to meet current codes. New elevator controllers must integrate with the existing SCADA system, and documents must support solicitation of a design-build contract. Performance will occur at the building location specified in the 2024 Elevator Assessment. No budget amounts or submission timelines are mentioned.