Inactive
Notice ID:2031ZA21Q00184
Please see attached SF 30 for Amendment details. This Statement of Work (SOW) is for the design, fabrication, assembly, integration, delivery, installation, set-up, testing, commissioning and training...
Please see attached SF 30 for Amendment details. This Statement of Work (SOW) is for the design, fabrication, assembly, integration, delivery, installation, set-up, testing, commissioning and training of one (1) cash-pak and wrap system that will plastic-wrap and heat shrink a cash-pak in accordance with BEP packaging requirements. The first Cash Pak and Wrap System shall be delivered to the Bureau of Engraving and Printing (BEP) Western Currency Facility (WCF). Under Option (1) the 2nd Cash Pak and Wrap System, shall be delivered to the BEP Washington D.C. Facility (DCF). Under Option (1) the first Repack Option shall be delivered to WCF. Under Option (2) the 2nd Repack Option shall be delivered to DCF. Spare parts are required in Option 1 and 2. Contractor shall provide all labor, travel, parts, materials, transportation, equipment, tools, training, supplies, management and supervision and all other items necessary to supply, deliver and install new Cash-Pak and Wrap System.