Z--SLV-CB Shop Floor (Concrete Work)
The Bureau of Reclamation requires a contractor to remove and replace damaged concrete features at a shop floor in the Alamosa Field Division area. The contractor must perform all demolition and concrete work, furnish equipment and materials, and conduct required testing. This is a total small business set-aside, with award anticipated to begin on or about August 1, 2026. The contract will be awarded based on best value, evaluating technical capability, past performance, and price. No budget amount is specified, and the location for performance is not explicitly stated beyond the Alamosa Field Division.