Replacement Central Section Sump Pumps for Hoover

Total Small Business Set-Aside (FAR 19.5)
Notice ID:140R3026Q0054

This opportunity is a total small business set-aside for the procurement and delivery of two Hydroflo vertical turbine sump pumps for Hoover Dam, with delivery to Boulder City, NV. The pumps must meet specific performance requirements, including 5000 GPM flow and a 150 HP motor. Delivery must be completed within approximately 6 months of award, with no penalty for early delivery. No budget amount is specified. The location for performance is the Bureau of Reclamation Hoover Dam Central Warehouse in Boulder City, Nevada.

Department/Ind.Agency Subtier Office
INTERIOR, DEPARTMENT OF THE BUREAU OF RECLAMATION LOWER COLORADO REGIONAL OFFICE
  PSC   4320 POWER AND HAND PUMPS


Data sourced from SAM.gov. View Official Posting »

43--Central Section Sump Pump Replacements-Hoover Dam

Inactive
Notice ID:140R3026Q0054

The Hoover Dam requires two replacement HydroFlo Vertical Turbine or equal sump pump assemblies. The new pumps must be fully interchangeable with the currently installed units to simplify maintenance and reduce parts inventory. The work involves only the supply of the pumps, as government personnel will handle the installation. The performance location is the Hoover Dam.

Department/Ind.Agency Subtier Office
INTERIOR, DEPARTMENT OF THE BUREAU OF RECLAMATION LOWER COLORADO REGIONAL OFFICE
  PSC   POWER AND HAND PUMPS
LOCATION: Not Given
Primary Contact
Mincey, Gilbert
702-***-8581


Data sourced from SAM.gov. View Official Posting »