Y--Truckee Canal - Lining and Check Structures
To line a section of the Truckee Canal with concrete over a geomembrane barrier and repair/replace two check structures, and general repairs to the site and supporting structures.
To line a section of the Truckee Canal with concrete over a geomembrane barrier and repair/replace two check structures, and general repairs to the site and supporting structures.
To line a section of the Truckee Canal with concrete over a geomembrane barrier and repair support structures.
Truckee Canal Extraordinary Maintenance (XM) Construction ¿ Phase 1. To line a section of the Truckee Canal with concrete over a geomembrane barrier.