59--GREEN SPRINGS ADAPTERS AND BUSHINGS
The Bureau of Reclamation requires replacement high-voltage bushings for a failed ABB 115 kV breaker bushing, including draw lead adapters, at the Green Springs Powerplant in Ashland, OR. The existing bushings showed degradation after testing. This acquisition is 100% set-aside for small businesses and will be a single firm-fixed-price contract. The anticipated award date is the third week of September. Vendors must be registered in SAM at the time of quote submission.