Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:140P8219R0009
REPLACE TEMPORARY FORCE MAIN TO KEALAKEHE WASTEWATER TREATMENT PLANT The Work includes installation of a 5,000 gallon buried holding tank (with float and warning fill controls), the realignment and co...
REPLACE TEMPORARY FORCE MAIN TO KEALAKEHE WASTEWATER TREATMENT PLANT The Work includes installation of a 5,000 gallon buried holding tank (with float and warning fill controls), the realignment and connection of an existing sewer force main to the new holding tank, installation of new sewer force main (with valves and valve box) to connect to an existing sanitary pipe for future use with permanent system, removal of existing lift station pumps, floats, and controller, replacement with new pumps, floats, controller (to be located outside of hazardous zone), and necessary electrical power and control improvements, Supervisory Control and Data Acquisition (SCADA) elements for operations and maintenance, and the removal of approximately 7,300 feet of partially buried and shallow buried 2� diameter High Density Polyethylene (HDPE) sanitary sewer force main and appurtenances.