HAVO 326181 Rehabilitate Rainshed&Water Treatment
Notice ID:140P2026R0091
HAVO 326181 Rehabilitate Rainshed & Water Treatment System located at Hawaii Volcanoes National Park, Volcano, Hawaii
Department/Ind.Agency
Subtier
Office
INTERIOR, DEPARTMENT OF THE
NATIONAL PARK SERVICE
DSC CONTRACTING SERVICES DIVISION
PSC
Y1NE CONSTRUCTION OF WATER SUPPLY FACILITIES
LOCATION:
Not Given
Links (0)
Attachments (15)
Document
Size
Access
Updated
Sol_140P2026R0091.pdf
644.75 KB
Public
Sep 18, 2026
B08_Att_(13)_HAVO_326181_Final_CD_Basis_of_Design_Product_Files.pdf
30.59 MB
Public
Sep 18, 2026
B08_Att_(2)_HAVO_326181_26_0908_Final_CD_Drawing_Set.pdf
39.06 MB
Public
Sep 18, 2026
B08_Att_(3)_2024_08_26_-_Geotechnical_Data_Report_-_HAVO_Rainsheds_Shear_Wave_Velocity_Survey.pdf
2.27 MB
Public
Sep 18, 2026
B08_Att_(5)_HAER_Drawings_HAVO_Rainshed.pdf
322.61 KB
Public
Sep 18, 2026
B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf
14.16 MB
Public
Sep 18, 2026
B08_Att_(6)_HAER_HAVO_Water_Collection_System_HI-76__Final_report.pdf
142.91 KB
Public
Sep 18, 2026
B08_Att_(7)_HAVO_326181_Construction_Phasing_Calcs.xlsx
210.05 KB
Public
Sep 18, 2026
B08_Att_(8)_HAVO_326181_Construction_Phasing_Memo.pdf
132.59 KB
Public
Sep 18, 2026
B08_Att_(9)_Redwood_Water_Tanks_Trip_Rpt_and_Prelim_Treat_Recs__2018.pdf
2.11 MB
Public
Sep 18, 2026
B08_Att_(10)_Davis-Bacon_Act_WD__HI20260001.pdf
1011.48 KB
Public
Sep 18, 2026
B08_Att_(11)_Solit_PSP_Vol_II_SubKPlan.docx
342.35 KB
Public
Sep 18, 2026
B08_Att_(12)_GenRefs.docx
27.75 KB
Public
Sep 18, 2026
B08_Att_(1)_HAVO_326181_26-0908_Project_Specifications.pdf
16.02 MB
Public
Sep 18, 2026
B08_Att_(14)_Hazardous_Material_Survey_HAVO_Rainshed_Enviroquest_May2025.pdf
3.65 MB
Public
Sep 18, 2026
Data sourced from SAM.gov.
View Official Posting »