Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:140P1419R0025
Amendment 0002 issued to 140P1419R0025: 1) Magnitude of Construction increased from $25,000 and $100,000 to $100,000 and $250,000. 2) Clarification: Contractor has option to excavate/trench down to ex...
Amendment 0002 issued to 140P1419R0025: 1) Magnitude of Construction increased from $25,000 and $100,000 to $100,000 and $250,000. 2) Clarification: Contractor has option to excavate/trench down to existing waterline connection point to reduce the bore length under the creek. 3) Price schedule in accordance with statement of work, which, at a minimum, shall include price breakdown of major components and total project cost. 4) Draft Schedule and basic approach for conducting the project activities shall be included for technical review. Please see INSTRUCTIONS TO OFFERORS on page 6 of solicitation. 5) Response date is extended to July 29, 2019. Amendment 0001 issued to 140P1419R0025 in response to questions received electronically: 1.) Question: In looking through the Specifications I noticed the Table of Contents references Division 3 ¿ Concrete, but I was unable to find any Division 3 specs. Could you verify if there are Division 3 specs and forward them, if there are? Answer: There are no division 3 specifications because there will be no concrete work required. It is an error in the table of contents. 2.)Question: Will you please clarify the size and length of this waterline relocation and the horizontal directional drilling scope of work, prior to making reservations or purchasing the plans? Answer: There is a 6" waterline and electrical conduit approximately 100 feet long, that will be relocated under the creek.