MI-SHIAWASSEE NWR-SEPTIC ALARM
140FC226Q0015
This project requires maintenance and repair of the septic system overflow alarm at the Shiawassee National Wildlife Refuge to ensure reliable operation. The work involves diagnosing and repairing the existing alarm, replacing components, upgrading to a more dependable model, and verifying all connections and sensors. The total project magnitude is below $25,000. All work must be performed on-site at the refuge.