Z--Pavement Restoration and Improvements, Detroit Riv
This project requires all labor, materials, and equipment to restore and replace bituminous paving and concrete surfaces, address site drainage, and restripe parking areas. The construction magnitude is between $100,000 and $250,000. The period of performance is 120 calendar days after the Notice to Proceed. The work will be performed at the Detroit River refuge site.