Z--Replace Water Control Structures 64 and 65
Contractor will provide all materials, equipment, labor and supervision to Replace Water Control Structure Unit 5 Drain (WCS 65) and 5C/GSL (WCS 64); including Cofferdams and Dewatering; Demolition Ex...
Contractor will provide all materials, equipment, labor and supervision to Replace Water Control Structure Unit 5 Drain (WCS 65) and 5C/GSL (WCS 64); including Cofferdams and Dewatering; Demolition Ex...
RFP and project documents estimated availability and issue date is 3 Apr 2021; Contractor will provide all materials, equipment, labor and supervision to Replace Water Control Structure 64 and 65; inc...