Inactive
Notice ID:PR11064212
The successful contractor shall provide laborers, equipment, and materials necessary to thoroughly clean the existing ductwork located at the NEC Cafeteria, Level 1 to the Roof. Cleaning will include ...
The successful contractor shall provide laborers, equipment, and materials necessary to thoroughly clean the existing ductwork located at the NEC Cafeteria, Level 1 to the Roof. Cleaning will include the Kitchen Hood (3910 x 1700mm), exhaust duct (300mm x 4000mm), roof Exhaust fan and Fire Smoke dampers (2 off), Exhaust grilles (6 off)