NEC - Embassy Switch Gear Breaker Replacement
This opportunity involves the emergency replacement and retrofit of obsolete main electrical switchgear at the Embassy compound and chancery building. The estimated budget for the entire period of performance is $202,000.00. The work requires supplying and installing genuine OEM Schneider Electric Square D breakers, as only these components are compatible with the existing proprietary infrastructure. Performance of services is located in Panama, with Schneider Electric Centro America identified as the sole authorized provider. The retrofit is time-sensitive due to an imminent risk of catastrophic electrical system failure that would halt all Embassy operations.