TEGUC-Feasibility Study for the design and construction of a dedicated underground medium voltage (MV) power feeder for the U.S. Embassy New Embassy Compound (NEC).
The U.S. Embassy in Honduras is seeking qualified Architect/Engineer firms to prepare a comprehensive Feasibility Study for a dedicated underground medium-voltage power feeder for the New Embassy Compound. The study must assess technical, regulatory, and logistical viability, evaluate local utility and contractor capacity, and analyze overhead alternatives. Offers are due by July 13, 2026 (Local Time). No specific budget amount is mentioned. Services will be performed in Honduras.